Intelligent Project Controls Platform
— By practitioners. For practitioners. —

Complex infrastructure.
Complete intelligence. Not just a schedule — a strategic weapon.

VEDAM unifies CPM scheduling, earned value management, parametric estimation, and AI-driven diagnostics in a single, purpose-built platform — giving project teams the visibility to act before delays become crises.

6 Integrated
modules
CPM Full critical
path engine
EVM Earned value
fully integrated
VEDAM — PROJECT DASHBOARD LIVE
Physical Progress
11%
vs 82% planned
Forecast Finish
+145d slip
Behind baseline
CPI
0.87
Cost performance
Health Grade
D
DELAYED
Progress
11%actual
Project
70%
Eng.
12%
Procure.
0%
Construct.
0%
S-Curve — Planned vs Actual
DD
Current Rate → Forecast slippage detected
EVM Metrics
EV
₹57Cr
AC
₹66Cr
CPI
0.87
EAC
₹577Cr
CV
−8.81
SV
+57.2
The Problem We Solve

Most delays are visible
only after it's too late

By the time a schedule slip appears in a status report, the window to recover has already closed. Traditional tools report the past — VEDAM reveals the future.

The Problem
Fragmented, reactive controls
Schedule, cost, and reports live in separate tools. Status reports are assembled manually, weeks late. By the time a risk is visible, the critical path has shifted.
The Gap
No intelligence layer
Scheduling tools compute float — they cannot tell you which activities are days from becoming critical, or that a procurement lead time is now controlling your finish date.
The Solution
VEDAM — one platform, full intelligence
CPM engine + EVM + parametric estimation + AI diagnostics + auto-narrative — unified in a single interface. No switching tools. No manual reporting.
41.6%
of centrally-monitored infrastructure projects in India were delayed as of March 2024 — still significantly higher than the pre-pandemic figure of 27.1%.
// MoSPI Infrastructure Status Report · March 2024 · Business Standard analysis
36 months
Average time overrun across 779 delayed central sector projects — three years beyond contracted completion. Railway projects show cost overruns averaging 54% above original estimates.
// MoSPI Flash Report · January 2024 · 1,821 projects monitored
Minutes,
not weeks
From a structured WBS to a full CPM schedule, EVM metrics, intelligence flags, and auto-generated narrative. What used to require a planning team and days of effort.
// VEDAM internal benchmark · 108 activities · CPM + EVM + Narrative
Six Modules. One Platform.

Every capability your
project controls team needs

From blank project setup to contract-ready progress narrative — VEDAM covers the full controls lifecycle without switching tools.

Dashboard

Live command centre. S-curve with three ETC scenarios, full EVM metrics, contract milestones, phase progress rings, and health grade — all auto-computed from CPM data.

Project Command
Experience it live

WBS Builder

Structured work breakdown with phase hierarchy, activity IDs, predecessor links, and constraint dates. The foundation your CPM engine computes from — rigorously.

Schedule Backbone

CPM Scheduler

Enterprise-grade critical path engine. Forward/backward pass, float computation, baseline comparison, progress tracking, and multi-band Gantt with critical activity highlighting.

Critical Path Engine
Experience it live

Schedule Intelligence

Automated diagnostics after every CPM run. Detects negative float, near-critical activities, logic gaps, procurement risk, and schedule density — categorised by severity and action priority.

AI-Powered Alerts
Experience it live

Parametric Estimator

Design-hour estimation engine calibrated on IFC-stage infrastructure project data. Discipline-level breakdowns, grade splits, and direct send-to-schedule integration.

Benchmarked Estimation
Experience it live

Analytics Module

SPI trend, delay accumulation, progress heatmap by phase and period, planned vs actual curves, critical activity count over time, and the What-If Modeller for scenario planning.

Trend & Forecasting
Experience it live
Also available
Schedule Narrative — Auto-generated report from CPM data
Programme status, critical path analysis, near-critical watch, flexibility, and phase summary — written automatically after every reschedule.
Experience Narrative live
Deep Dive

See every module
in action

Select a module below to explore its interface and capabilities.

Schedule Intelligence

Your schedule knows
things you don't yet

VEDAM's intelligence engine runs a full diagnostic on every CPM computation — not just reporting what happened, but what's about to happen.

⚠️
Negative Float DetectionFlags activities with infeasible constraints before they cause cascading delays across the critical path.
🔶
Near-Critical WatchMonitors activities within 5% of total float. Names the exact predecessor slippage that would push them critical.
🔗
Logic Integrity CheckDetects open ends — activities with no successors or predecessors — that corrupt float calculations.
📦
Procurement Risk RadarIsolates procurement activities on the critical path and computes their exact impact on project finish.
SCHEDULE INTELLIGENCE108 activities · 34 critical
2 activities with negative float — project schedule is infeasible
15 near-critical activities within 5% of total float — one slip cascades
Procurement on critical path — 2 activities have zero float
🔗 15 activities have no successors — schedule logic may be incomplete
🔴
Immediate Action
Infeasible constraints detected
2 activities cannot finish within their late finish date: "Project Brief & Scope Confirmation" (−6d), "Design Brief & Technical Parameters" (−4d). Review predecessor logic or constraint dates.
🟡
Near-Critical Watch
15 activities within days of becoming critical
"Interlocking & Equipment Room Fit-Out" has only 1d of float. Any predecessor slippage by 2d joins the critical path and moves the finish date.
🔵
31% Critical Density
Testing & Commissioning has zero buffer
10 T&C activities on critical path with no float. Every day of delay is a day of project delay — no recovery without resequencing.
CPM Scheduler

Not just a Gantt —
a living programme

Full forward and backward pass, float computation, baseline comparison, and real-time critical path updates as data dates advance.

📐
Enterprise-Grade CPM EngineForward/backward pass, Early/Late Start/Finish, total and free float for every activity.
📏
Baseline ComparisonDual-band Gantt shows original baseline alongside current schedule. Visual variance at a glance.
🔴
Critical Path HighlightingCritical activities highlighted across Gantt and WBS. One-click filter to view only the critical chain.
🔗
Predecessor Link VisualisationToggle dependency arrows to see FS, SS, FF relationships drawn on the Gantt directly.
CPM SCHEDULER — GANTT VIEW● BASELINE ACTIVE
Activity
Status
Rem Dur
Jan — Jun 2025 →
▼ PS — Project Setup
2.1w
Land Survey & Boundary Dem.
Not Started
1.6w
Social Impact Assessment
Not Started
2.4w
Land Acquisition Notification
Not Started
1.6w
▼ PS.UT — Utilities
1.1w
Utilities Detection & Mapping
Not Started
1.2w
Utility Diversion Design & NOCs
Not Started
1.6w
▼ PS.PE — Permits
1.3w
DPR Approval — State + Central
At Risk
4w
▼ ENG — Engineering
Corridor & Preliminary Alignment
Not Started
3.2w
Parametric Estimator

Benchmark-backed
hours in minutes

Calibrated on real IFC-stage infrastructure data. Enter project parameters — get validated discipline-level hour breakdowns with grade splits and cost conversion.

📊
Discipline-Level BreakdownSurvey, Alignment & Civil, Track, Structures, OHE, Signalling, Architecture, and more — computed individually.
👥
Grade Split AnalysisDirector / Senior / Mid-Senior / Junior allocation based on discipline complexity benchmarks from live projects.
🔁
Send to ScheduleEstimated hours flow directly into the CPM Scheduler as activity durations — no re-entry, no errors.
💱
Currency ConversionLive exchange rate with manual override for multi-currency cost conversion across all disciplines.
VEDAM ESTIMATOR35% CONFIDENCE
Metro
Preliminary Design
50
8
Total Design Hours
Across all stations · 2,694 hrs/km
1,34,689
Effort by Discipline
Alignment & Civil
37,480
Structures
28,900
OHE / Electrification
19,189
Track Design
15,358
Survey & Geotech
11,850
Project Management
6,880
Analytics Module

Trend intelligence across
every reporting period

Longitudinal view of project performance — SPI trajectory, delay accumulation, progress curves, and What-If scenario modelling for recovery planning.

📈
SPI Trend ChartTrack Schedule Performance Index across all reporting periods. Detect whether performance is genuinely improving or masking further drift.
What-If ModellerModel activity slips and see cascading impact on project finish. Compute required SPI to recover baseline in real time.
🎯
Recommended Action EngineFor every risk — root cause, recommended action, and expected schedule impact. Prioritised by severity.
📊
Critical Activity CountWatch how the number of critical activities evolves over time — a rising count signals a schedule becoming increasingly fragile.
ANALYTICS — VARIANCE TRENDSPI improving · delay still growing
SPI Latest
0.73
↑ improving
Delay
+32d
↑ growing
Progress
32%
+8% period
Trend
Stabilising
⚡ Trend Analysis
SPI improved +0.06 over 6 periods. Delay accumulating at 6.4 days/period. 2 activities with negative float — resolve immediately.
SPI Over Time
SPI 1.0
Delay Accumulation (days)
Planned vs Actual Progress
28%
Progress Heatmap

Phase performance
across every period

A time-series matrix of SPI per phase — instantly showing which phases are degrading, when decline began, and where attention is needed most.

🌡️
Phase × Period MatrixSPI colour-coded from green (ahead) to red (critical) for each discipline across every reporting period.
📉
Degradation TrackingWatch SPI trend per phase over time — the direction of change is as important as the current value.
🏷
Status LabelsAuto-assigned On Track / Behind / Critical / Pending status for each phase at the latest period.
🔍
Drill-Down ReadyClick any phase to jump to its detailed schedule view with activity-level breakdown and float analysis.
PROGRESS HEATMAP — PHASE BY PERIODJun '25 — Mar '26
Phase Jun '25 Aug '25 Oct '25 Dec '25 Feb '26 Mar '26 SPI Status
Project Setup 1.00 1.05 0.95 0.92 0.88 0.87 0.87 On Track
Engineering 0.90 0.85 0.80 0.78 0.75 0.76 0.76 Behind
Procurement 0.95 0.88 0.82 0.79 0.75 0.73 0.73 Behind
Construction 0.70 0.68 0.65 0.64 0.64 Critical
Testing & Commissioning Not started Pending
Schedule Narrative

The report writes itself —
accurately

Auto-generated from CPM data after every reschedule. Five structured sections. Dozens of live data points. Zero manual writing.

📋
Programme StatusPhysical progress vs target, SPI, forecast finish, and health grade — all stated precisely from live CPM computation.
🔴
Critical Path AnalysisLeading critical activities named, negative float flagged, and path density reported in plain language.
🟡
Near-Critical & FlexibilityNear-critical watch list and high-float activities available for resource reallocation — both surfaced automatically.
📊
Phase-by-Phase SummaryCompletion percentages and critical counts per phase — the structured summary your client or PMC expects.
SCHEDULE NARRATIVEAuto-generated · Run Reschedule to refresh
📋
Programme Status
Section 1 of 5 · Auto-generated
Physical progress is 11% against a scheduled target of 82% by data date. The forecast finish represents a slip of 145 days against the original baseline. Programme duration: 372 calendar days. SPI stands at 0.13 — the programme is significantly behind the planned rate of progress. Health Grade: D.
"Immediate intervention required. Current trajectory does not meet baseline finish."
🔴
Critical Path Analysis
Section 2 of 5 · Auto-generated
34 activities on the critical path (31% of programme). Leading activities: PS.LA.01 Land Survey & Boundary Demarcation, PS.CI.01 Project Brief & Scope Confirmation, and 29 more. 2 activities have negative float — immediate recovery action required.
🟡
Near-Critical Activities
Section 3 of 5 · Auto-generated
Corridor & Preliminary Alignment (float: 4d), Detailed Alignment & Civil Design (float: 4d), Drainage & Road Works Design (float: 4d) — any delay on these activities will directly impact project completion.
🟢
Schedule Flexibility
Section 4 of 5 · Auto-generated
High-float activities available for resource reallocation: Archaeological / Heritage NOC (144d float), Railway & Road Crossing Permissions (141d float), Forest & Wildlife Clearance (135d float).
The VEDAM Workflow

From blank project
to live intelligence

Five steps. One platform. Full project controls — from first activity to final narrative.

1
Define WBS
Build phases, disciplines, activity IDs, and durations.
2
Link Logic
Add predecessors, constraints, and milestone dates.
3
Run CPM
Engine computes critical path, float, and EVM instantly.
4
Update Progress
Enter actuals — forecasts recalculate in real time.
5
Read the Story
Narrative, alerts, and recommended actions auto-generate.
Get Started

Your next project
deserves VEDAM

Stop assembling status reports manually. Stop discovering delays after they've compounded. Let VEDAM turn your schedule data into project intelligence.

Get in Touch

Let's talk about your project

Whether you want to explore VEDAM, request a demo, or just have a question — we'd love to hear from you.

Contact Us
📧
🌐
Website
vedamhq.com
Send us a Message →
We typically respond within 24 hours